Information Updates
Information Updates
- 2016.12.28
-
"What are new mechanisms?" has been updated.
- 2016.12.27
-
Call for public inputs on proposed JCM projects (Laos) "Lao PDR Energy Efficient Datacenter Project (LEED)" (27 December 2016 to 25 January 2017) has been started.→This call for public inputs has been closed.
- 2016.12.27
-
Call for public inputs on proposed revisions to the approved methodology MN_AM003 (Mongolia) "Installation of Solar PV System" (27 December 2016 to 10 January 2017) has been started.→This call for public inputs has been closed.
- 2016.12.22
-
The latest version of the document "ADB Trust Fund: Japan Fund for Joint Crediting Mechanism (JFJCM)" has been uploaded.
- 2016.12.17
-
Call for public inputs on a JCM proposed methodology (Cambodia) “Installation of Solar PV System” (17 December to 31 December 2016) has been started.→This call for public inputs has been closed.
- 2016.11.17
-
"4th JCM Partner Countries' High-level Meeting" was held in COP22. (MOE)
- 2016.10.20
- 2016.10.14
- 2016.10.04
-
Call for public inputs on a JCM proposed methodology (Viet Nam) “Installation of Solar PV System” (4 October to 18 October 2016) has been started.→This call for public inputs has been closed.
- 2016.09.29
- 2016.09.21
-
"Kyoto Mechanisms Information Platform" has ended the operation.
- 2016.09.21
-
"What are new mechanisms?" has been uploaded.
- 2016.09.13
-
Call for public inputs on a JCM proposed methodology (Mongolia) "Installation of Solar PV System" (13 September to 27 September 2016) has been started.→This call for public inputs has been closed.
- 2016.08.30
-
"ADB Trust Fund: Japan Fund for Joint Crediting Mechanism (JFJCM)" has been uploaded.
- 2016.08.23
- 2016.08.22
-
The latest version of the document "Recent Development of The Joint Crediting Mechanism (JCM)" has been uploaded.
- 2016.08.20
- 2016.08.17
-
Call for public inputs on a JCM proposed methodology (Viet Nam) “Introduction of air conditioning system equipped with inverters” (17 August to 31 August 2016) has been started.→This call for public inputs has been closed.
- 2016.08.09
-
Call for public comments on a JCM proposed methodology (Thailand) “Energy Saving by Introduction of High Efficiency Centrifugal Chiller” (9 August to 23 August 2016) has been started.→This call for public comments has been closed.
- 2016.08.06
-
Call for public comments on a proposed JCM project (Indonesia) “Introducing double-bundle modular electric heat pumps at AXIA SOUTH CIKARANG Tower 2” (6 August to 4 September 2016) has been started.→This call for public comments has been closed.
- 2016.08.06
-
Call for public comments on a JCM proposed methodology (Thailand) “Energy Saving by Introduction of Multi-stage Oil-Free Air Compressor” (6 August to 20 August 2016) has been started.→This call for public comments has been closed.
- 2016.08.04
-
Call for public inputs on a JCM proposed methodology (Laos) “Installation and operation of energy-efficient data center (DC) in the Lao PDR” (4 August to 18 August 2016) has been started.→This call for public inputs has been closed.
- 2016.07.30
- 2016.07.29
-
Call for public comments on a JCM proposed methodology (Thailand) "Installation of Solar PV System" (29 July to 12 August 2016) has been started.→This call for public comments has been closed.
- 2016.07.29
-
Call for public inputs on proposed revisions to the approved methodology (Viet Nam) VN_AM001 "Transportation energy efficiency activities by installing digital tachograph systems" (29 July to 12 August 2016) has been started.→This call for public inputs has been closed.
- 2016.07.26
-
List of Selected Projects and Studies under JCM Support Programme has been updated.
- 2016.07.22
-
"Basic Concept of the JCM" has been updated.
- 2016.07.12
-
4th Joint Committee in Koror
The Joint Committee (Palau and Japan) approved 2 JCM projects. - 2016.07.07
- 2016.07.07
- 2016.06.22
-
The latest version of the document "Recent Development of The Joint Crediting Mechanism (JCM)" has been uploaded.
- 2016.06.21
- 2016.06.17
- 2016.06.03
- 2016.05.23
-
”FAQ" has been updated.
- 2016.05.16
- 2016.05.15
- 2016.05.13
-
Call for public comments on a proposed JCM methodology (Indonesia) "Installation of energy saving air jet loom at textile factory" (13 May to 27 May 2016) has been started.→This call for public comments has been closed.
- 2016.05.13
- 2016.04.26
- 2016.04.21
- 2016.04.19
-
The relevant information for the JCM between Japan and Indonesia has been updated.
- 2016.04.14
-
Call for public comments on a proposed revision to the approved methodology (Indonesia) ID_AM009 “Replacement of conventional burners with regenerative burners for aluminum holding furnaces" (14 April to 28 April, 2016) has been started.→This call for public comments has been closed.
Decision by the JC between Indonesia and Japan - 2016.04.12
-
Call for public comments on a proposed JCM methodology (Indonesia) "Reduction of Energy Consumption by Introducing an Energy-Efficient Old Corrugated Carton Processing System into a Cardboard Factory" (12 April to 26 April 2016) has been started.→This call for public comments has been closed.
- 2016.04.08
- 2016.04.05
-
Call for public inputs on a proposed JCM methodology (Cambodia) "Installation of LED street lighting system with wireless network control" (5 April to 19 April 2016) has been started.→This call for public inputs has been closed.
- 2016.04.04
- 2016.03.31
-
The pamphlet "New Mechanisms Express : March 2016" has been uploaded.
- 2016.03.29
-
The relevant information for the JCM between Japan and Bangladesh has been updated.
- 2016.03.24
- 2016.03.16
-
The relevant information for the JCM between Japan and Ethiopia has been updated.
- 2016.03.09
- 2016.03.08
-
The relevant information for the JCM between Japan and Kenya has been updated.
- 2016.02.19
-
Call for public inputs on a proposed JCM project (Viet Nam) “Introduction of amorphous high efficiency transformers in power distribution systems in the southern part of Viet Nam” (19 February to 19 March 2016) has been started.→This call for public inputs has been closed.
- 2016.02.18
-
Call for public inputs on proposed JCM projects (Palau) "Small Scale Solar Power Plants for Schools in Island States" and “Small Scale Solar Power Plants for Commercial Facilities in Island States II” (18 February to 18 March 2016) has been started.→This call for public inputs has been closed.
- 2016.02.10
-
Call for public inputs on a proposed JCM methodology (Ethiopia) "Electrification of communities using Micro hydropower generation" (From 10 Feb to 24 Feb 2016) has been started.→This call for public inputs has been closed.
- 2016.02.05
-
List of JCM Projects and Studies has been updated.
- 2016.02.05
-
Call for public inputs on a proposed BOCM methodology (Bangladesh) "Energy Saving by Introduction of High Efficiency Centrifugal Chiller" (From 5 Feb to 19 Feb 2016) has been started.→This call for public inputs has been closed.
- 2016.02.05
- 2016.02.03
-
The latest version of the document "Recent Development of The Joint Crediting Mechanism (JCM)" has been uploaded.
- 2016.02.03
- 2016.01.29
- 2016.01.19
-
Call for public inputs on a proposed JCM methodology (Kenya) "Electrification of communities using Micro hydropower generation" (From 19 Jan to 2 Feb 2016) has been started.→This call for public inputs has been closed.
- 2016.01.15
-
List of JCM Projects and Studies has been updated.