Joint Crediting Mechanism
Methodologies
Approved Methodologies
Country | Methodology Number | Sectoral Scope | Methodology Title | GHG Reduction Method |
---|---|---|---|---|
Bangladesh | BD_PM001 | Energy Saving by Introduction of High Efficiency Centrifugal Chiller |
||
Bangladesh | BD_PM002 | Installation of Solar PV System |
||
Bangladesh | BD_PM003 | Energy efficiency improvement through the introduction of energy efficient air jet looms in textile industry |
||
Ethiopia | ET_PM001 | Electrification of communities using Micro hydropower generation |
||
Ethiopia | ET_PM002 | Electrification by photovoltaic power generation in Ethiopia |
||
Ethiopia | ET_PM003 | Introduction of Biomass Combined Heat and Power Plant |
||
Indonesia | ID_PM001 | Power Generation by Waste Heat Recovery in Cement Industry |
||
Indonesia | ID_PM002 | Energy Saving by Introduction of High Efficiency Centrifugal Chiller |
||
Indonesia | ID_PM003 | Installation of Energy-efficient Refrigerators Using Natural Refrigerant at Food Industry Cold Storage and Frozen Food Processing Plant |
||
Indonesia | ID_PM004 | Installation of LED Lighting for Grocery Store |
||
Indonesia | ID_PM005 | Installation of Inverter-Type Air Conditioning System for Cooling for Grocery Store |
||
Indonesia | ID_PM006 | GHG emission reductions through optimization of refinery plant operation in Indonesia |
||
Indonesia | ID_PM007 | GHG emission reductions through optimization of boiler operation in Indonesia |
||
Indonesia | ID_PM008 | Installation of a separate type fridge-freezer showcase by using natural refrigerant for grocery store to reduce air conditioning load inside the store |
||
Indonesia | ID_PM009 | Replacement of conventional burners with regenerative burners for aluminum holding furnaces |
||
Indonesia | ID_PM010 | Introducing double-bundle modular electric heat pumps to a new building |
||
Indonesia | ID_PM011 | Energy Saving by Introduction of High Efficiency Centrifugal Chiller |
||
Indonesia | ID_PM012 | Installation of Energy-efficient Refrigerators Using Natural Refrigerant at Food Industry Cold Storage and Frozen Food Processing Plant |
||
Indonesia | ID_PM013 | Installation of Inverter-Type Air Conditioning System for Cooling for Grocery Store |
||
Indonesia | ID_PM014 | Installation of LED Lighting for Grocery Store |
||
Indonesia | ID_PM015 | Installation of a separate type fridge-freezer showcase by using natural refrigerant for grocery store to reduce air conditioning load inside the store |
||
Indonesia | ID_PM016 | Reduction of Energy Consumption by Introducing an Energy-Efficient Old Corrugated Carton Processing System into a Cardboard Factory |
||
Indonesia | ID_PM017 | Replacement of conventional burners with regenerative burners for aluminum holding furnaces |
||
Indonesia | ID_PM018 | Installation of energy saving air jet loom at textile factory |
||
Indonesia | ID_PM019 | GHG emission reductions through optimization of refinery plant operation in Indonesia |
||
Kenya | KE_PM001 | Electrification of communities using Micro hydropower generation |
||
Kenya | KE_PM002 | Installation of Solar PV System |
||
Kenya | KE_PM003 | Installation of Run-of-river Small Hydropower Generation Plant |
||
Cambodia | KH_PM001 | Installation of LED street lighting system with wireless network control |
||
Cambodia | KH_PM002 | Installation of Solar PV System |
||
Laos | LA_PM001 | Installation and operation of energy-efficient data center (DC) in the Lao PDR |
||
Mongolia | MN_PM001 | Installation of energy-saving transmission lines in the Mongolian Grid |
||
Mongolia | MN_PM002 | Replacement and Installation of High Efficiency Heat Only Boiler (HOB) for Hot Water Supply Systems |
||
Mongolia | MN_PM003 | Installation of Solar PV System |
||
Mongolia | MN_PM004 | Installation of Solar PV System |
||
Maldives | MV_PM001 | Displacement of Grid and Captive Genset Electricity by a Small-scale Solar PV System |
||
Palau | PW_PM001 | Displacement of Grid and Captive Genset Electricity by a Small-scale Solar PV System |
||
Thailand | TH_PM001 | Installation of Solar PV System |
||
Thailand | TH_PM002 | Energy Saving by Introduction of Multi-stage Oil-Free Air Compressor |
||
Thailand | TH_PM003 | Energy Saving by Introduction of High Efficiency Centrifugal Chiller |
||
Thailand | TH_PM004 | Installation of energy saving air jet loom at textile factory |
||
Thailand | TH_PM005 | Energy Saving by Introduction of High Efficiency Non-Inverter Type Centrifugal Chiller |
||
Thailand | TH_PM006 | Energy Saving by Introduction of Multi-stage Oil-Free Air Compressor |
||
Thailand | TH_PM007 | Installation of Displacement Ventilation Air Conditioning Unit in the Cleanroom of Semiconductor Manufacturing Factory |
||
Viet Nam | VN_PM001 | Transportation energy efficiency activities by installing digital tachograph systems |
||
Viet Nam | VN_PM002 | Waste heat recovery for electricity generation |
||
Viet Nam | VN_PM003 | Introduction of room air conditioners equipped with inverters to public sector buildings |
||
Viet Nam | VN_PM004 | Improving the energy efficiency of commercial buildings by utilization of high efficiency equipment |
||
Viet Nam | VN_PM005 | Anaerobic digestion of organic waste for biogas utilization within wholesale markets |
||
Viet Nam | VN_PM006 | Installation of energy efficient transformers in a power distribution grid |
||
Viet Nam | VN_PM007 | Transportation energy efficiency activities by installing digital tachograph systems |
||
Viet Nam | VN_PM008 | Introduction of air conditioning system equipped with inverters |
||
Viet Nam | VN_PM009 | Installation of Solar PV System |
||
Viet Nam | VN_PM010 | Installation of LED lighting equipment to fishing boats |
||
Viet Nam | VN_PM011 | Installation of Container Formation Facility at Acid Lead Battery Factory |