Call for public inputs on a proposed JCM project (Saudi Arabia) “Introduction of High Efficiency Electrolyzer in Chlor-Alkali Production Plant” (30 January 2018 to 28 February 2018) has been started.
Call for public inputs on a proposed JCM project (Saudi Arabia) "Introduction of High Efficiency Electrolyzer in Chlor-Alkali Production Plant" (30 January 2018 to 28 February 2018) has been started.