Call for public inputs on a proposed JCM project (Bangladesh) “Installation of High Efficiency Loom at Weaving Factory” (22 December 2017 to 20 January 2018) has been started.
Call for public inputs on a proposed JCM project (Bangladesh) "Installation of High Efficiency Loom at Weaving Factory" (22 December 2017 to 20 January 2018) has been started.