Call for public inputs on a JCM proposed methodology (Saudi Arabia) “Introduction of High Efficiency Electrolyzer in Chlor-Alkali Processing Plant” (18 September to 2 October 2017) has been started.
Call for public inputs on a JCM proposed methodology (Saudi Arabia) "Introduction of High Efficiency Electrolyzer in Chlor-Alkali Processing Plant" (18 September to 2 October 2017) has been started.