Thailand: Energy Saving for Semiconductor Factory with High Efficiency Centrifugal Chiller and Compressor [Sony Semiconductor Manufacturing Corporation]

2017.04.03

High-efficiency centrifugal chiller and air-compressor were installed in the clean room of a semiconductor factory located in central Thailand.

 

The factory was affected by the great flood in 2011 and this project was implemented as a part of refurbishment construction.

 

Image sensor for digital single-lens camera is post-processed in the clean room of this factory. High-efficiency and high-performance equipment enable to control the accurate temperature and humidity in the clean room.

Related Links

  • Factory for semiconductor manufacturing (post-process)
  • Front entrance of the factory covered with the great flood of 2011
  • JCM Project Briefing Session to Japanese and Thailand Government Missions
  • High efficiency centrifugal Chiller, air Compressor and swirling induction type HVAC system funded by the JCM Model Project